Wall Report Jan 2024
Items to be completed from last report: Rocks to be replaced in various walls, Roots of vine in wall
behind BBQ area
Brick walls to be painted: casa 9 – Veronica following up with owner, casa 30 referred on to the cls
board ( Kerry), casa 7 referred to the Architectural Committee
I wrote to the cls board to advise the wall on the east of the main road needs repair and painting