Inspection Report 06-Oct-2022
First Annual Wall Inspection – Wall Committee, Barbara Baker and Steve SayceThe inspection was done on 6 October 2022. We inspected most of the perimeter walls and found them
to be in acceptable condition.
One area to be watched is the wall at the south west corner of casa 55. On the outside of the wall there
is a hole and a trench. As the land slopes to it, it seems it would fill with water during some rain storms.
We spoke to the owner of the property and he has agreed to watch it and let us know if it becomes a
problem. It was suggested that if he has a machine on his property in the future, he could have the land
leveled in this area. The owners of casa 55 say they have not had a problem with the wall.
When inspecting the eastern wall adjacent to the new development, it was noted that they did not build
a second boundary wall against ours. They have covered the bricks on our wall with stucco and built 3
supports adjacent to casa 62 which reach to the top of the rock portion.